Diamond Resource and Reserve update for Liqhobong Mine
The Diamond Resource was updated at the end of the financial year to account for the mining that took place during the year. Mining operations resumed in August 2022 after a period of care and maintenance that began in March 2020. The depletion during the year ending 30 June 2023 amounted to 2.796 million tonnes and 0.708 million carats. An estimated total of 0.0229 million tonnes of ore and 0.0057 million carats was found to reside on the run-of-mine (“ROM”), in-pit, and low-grade stockpiles. Therefore, as at 30 June 2023, the Liqhobong Mine’s total Indicated Resource was estimated to be 20.048 million tonnes at a grade of 22 carats per hundred tonnes (“cpht”), containing 4.363 million carats. This represents a 12.45% reduction in Metric tonnes compared to the 2022 Indicated Diamond Resource statement. There were no changes reported for the Inferred Resource.
Diamond Resource statement for Liqhobong Main Pipe as at 30 June 2023 (including Reserves)
Diamond Resource Category |
Depth from and to |
Volume in m3 (millions) |
Specific gravity (tonnes/m3) |
Metric tonnes (millions) |
Grade (cpht) |
Carats (millions) |
Indicated |
2 603 masl to 2 467 masl |
7.731 |
2.59 |
20.048 |
22 |
4.363 |
Inferred |
2 467 masl to 2 127 masl |
18.184 |
2.66 |
48.399 |
24 |
11.423 |
Total Diamond Resource |
25.915 |
2.64 |
68.447 |
23 |
15.786 |
- Diamond Resources as at 30 June 2023, reported inclusive of reserves.
- Tonnes are metric tonnes and totals are rounded.
- Stated at a bottom cut-off of 1.25mm slotted screen apertures.
Diamond Reserve
The current mine plan includes the mining of cut 1 and cut 2 only. Options to revert to a longer Life of Mine (“LOM”) plan, which encompasses, for example, a cut 3 North would be considered in the future, should there be an overall improvement in the project economics, including average diamond prices or exchange rates, or further upside in pit optimisations.
Diamond Reserve statement for the Liqhobong Main Pipe as at 30 June 2023
|
|
|
Diamond Reserve |
||
Diamond Reserve Category |
Depth from and to |
Specific gravity (tonnes/m3) |
Metric tonnes (millions) |
Grade (cpht) |
Carats (millions) |
Probable |
2 603 masl to 2 467 masl |
2.59 |
20.048 |
22 |
4.363 |
Total Diamond Reserve |
2.59 |
20.048 |
22 |
4.363 |
- Tonnes are metric tonnes and totals are rounded.
- Stated at a bottom cut-off of 1.25mm slotted screen apertures.
The Reserves and Resources Statement was independently compiled by Polite Khutjwe (Pri.Sci.Nat., B.Sc. (Hons) Applied Geology), a competent person, who was appointed as a consultant by the Company for this purpose.